6.1 KiB
SFERA Completion Plan
Дата аудита: 2026-05-16.
Этот план фиксирует путь к завершению SFERA как продукта. Он не подменяет
IMPLEMENTATION_ORDER.md, а добавляет проверяемые критерии готовности и текущий статус.
Текущее состояние
SFERA уже содержит рабочий backend/API, Rust BSL parser, SIR, semantic kernel, projection/incremental контур, runtime/governance/knowledge/collaboration пакеты и Next.js IDE.
Текущая проверенная база:
- Python/API tests:
219 passed. - Rust tests:
15 passed. - Frontend
typecheck: passed. - Frontend production
next build: passed. - Editor smoke: passed.
- Editor runtime smoke: passed.
- Shared Docker host smoke: passed for API, web, PostgreSQL, Neo4j, Qdrant, Redis and object storage on
test-docker. - Local Git baseline: initialized on branch
main, first commit3b845c8.
Definition Of Done
Проект считается завершённым для production-ready milestone, когда выполнены все пункты:
- Все фазы из
IMPLEMENTATION_ORDER.mdимеют deterministic implementation без placeholder/stub. - Все parser bugs покрыты golden fixtures.
- SIR snapshot validates для BSL/XML metadata projects.
- Projection and incremental update pass against in-memory and Neo4j-compatible contracts.
- API exposes project, semantic, governance, knowledge, collaboration and IDE workflows.
- Frontend builds production bundle and passes editor smoke/runtime checks.
- Stand runbook is executable on local/NAS and shared Docker host.
- A single verification command can reproduce core/backend/Rust/frontend checks.
Phase Plan
Phase 1 — Semantic Core
Status: mostly complete.
Completed:
packages/sir.rust/crates/bsl-parser.- Rust
query-parserfoundation. - Rust
semantic-enginefoundation. packages/semantic-kernel.packages/projection-engine.packages/incremental-indexer.- Golden fixtures for mixed RU/EN syntax, calls, queries, writes, object writes and recordset writes.
- Same-module routine resolution priority for duplicate routine names.
- SIR diagnostics for malformed BSL routine/query boundaries.
- Incremental diagnostic refresh for changed BSL fragments.
- Routine
Экспорт/Exportflags preserved in SIR node attributes. - BSL control-flow fixture for calls/writes inside loops and try/except blocks.
- Form event handler links from XML metadata to BSL routines.
Remaining:
- Keep parser and XML fixtures expanding as new 1C export patterns are encountered.
Phase 2 — Object Runtime
Status: implemented with tests, needs broader fixtures.
Completed:
- XML metadata fixtures preserve register dimensions/resources as SIR attributes.
- Semantic versioning classifies object rename/move/update changes.
- Object impact includes form event handlers and their register writes.
- XML fixtures cover child-element forms, commands and role rights.
- Query intelligence reports register read/write dependencies.
- Transaction topology groups routines by written register target.
- Object impact can include scheduled-job integration endpoints from the owning module.
Remaining:
- Add more impact/review fixtures for object-level dependency edge cases as new patterns are found.
Phase 3 — Runtime Intelligence
Status: implemented with tests, needs integration depth.
Remaining:
- Expand transaction/query intelligence with register movement patterns.
- Connect UI semantics to editor panels and review findings.
- Add scheduled job and integration cross-links to impact reports.
Phase 4 — Knowledge System
Status: implemented with tests.
Remaining:
- Add import fixtures for larger BSP/vendor packs.
- Add coverage reports by metadata subtree.
Phase 5 — Collaboration
Status: implemented with tests.
Remaining:
- Enforce task/session binding for mutations outside Phase 1 placeholders.
- Add UI flow coverage for comments/ownership/activity.
Phase 6 — Governance/Operations
Status: implemented with tests.
Remaining:
- Verify full stand runbook on
test-docker. - Add backup/restore and migration smoke checks.
Phase 7 — 1C IDE / Authoring
Status: working Next.js IDE exists and passes smoke; advanced authoring remains product work.
Completed:
- Backend and typed frontend API client for symbol search, go to definition and find references.
Remaining:
- Wire editor actions for go to definition, find references and symbol search into IDE panels.
- Complete semantic autocomplete from SIR + metadata context.
- Complete guarded apply with preview, semantic diff, impact, review, RBAC/privacy and version record.
- Complete object/form/report designer flows.
- Add browser smoke for key authoring flows.
AI Layer
Status: intentionally gated until semantic truth is stronger.
Remaining:
- Add answer/generation policy enforcement to every AI-facing endpoint.
- Add prompt/context builders over SIR, metadata, knowledge, privacy and task/session.
- Add preview-only AI code generation and guarded apply workflow.
Execution Order From Here
- Connect the local Git baseline to the canonical Gitea repository on
git.cin.suafter the exact repository path is available. - Keep all current green checks green with
scripts/check_all.ps1. - Reduce API test/runtime latency so the full Python suite stays comfortably below CI timeout budgets.
- Finish Phase 1 hardening fixtures and diagnostics.
- Expand Phase 2/3 fixtures around metadata, impact, query and runtime topology.
- Finish guarded apply and object-level authoring API.
- Finish IDE authoring UI and smoke coverage.
- Add AI pair-programmer only after guarded apply is deterministic.
- Verify full stand on local/NAS and shared Docker host.
Verification
Use:
.\scripts\check_all.ps1
Expected checks:
cargo test && cargo build -p bsl-parseruv run pytestnpm run typechecknext build- optional frontend smoke checks when API/frontend stand is running.